Before installing or operating the low-voltage soft starter, please read and understand the low-voltage product manual. Only professionals can install, debug, repair and maintain the soft starter.
Installation and maintenance operations should be strictly in accordance with the relevant national standards and industry practices in the low-voltage product manual, otherwise the manufacturer will not be responsible for any adverse consequences caused by the failure to follow the corresponding known specifications.
Before servicing or maintaining the soft starter, all power inputs must be disconnected.
After installation, check carefully to verify that no parts (such as screws, washers, etc.) fall into the live parts.
Precautions for low-voltage soft start installation
For cooling purposes, the soft starter must be installed in a vertical direction.
In order to ensure good heat dissipation, there should be enough space when installing the soft starter.
The main circuit adopts top in and bottom out, and the wire should ensure sufficient current carrying capacity.
High voltage safety precautions
The information described in the high voltage product manual should be used in conjunction with the safety procedures of your workplace.
Everyone is responsible for ensuring that they work in a safe manner and comply with any local laws or site regulations.
Ensure that the work area is not dangerous.
Evaluate the risk and make a list, and discuss with relevant personnel.
Know how to contact emergency assistance quickly.
Installation and maintenance operations should be strictly in accordance with the high-voltage product manuals, national standards and industry practices, otherwise the manufacturer will not be responsible for any adverse consequences caused by the failure to follow the corresponding guidelines.
Before servicing the soft starter or motor, all power inputs must be disconnected.
After installation, check carefully to verify that no parts (such as screws, washers, etc.) fall into the live parts.
Precautions for high-voltage installation
Installation work must be done by qualified personnel under qualified supervision.
Both compressed air and electricity are very dangerous. Before doing any work on the compressor, make sure that the power is cut off and the pressure has been unloaded.
The installation of this heat recovery system must comply with recognized local health and safety standards and water and plumbing standards. Any connections/components other than the compressor used to control the flow, temperature and pressure of the inlet or outlet water of the heat recovery system are within the responsibility of the installation operator or the customer.
This product should be installed in a place where there are no obstacles or dangerous objects during operation and maintenance, and clear indication signs can be seen at all times.
If the product must be placed on a high platform, it must not interfere with normal operations or obstruct access. Platforms and stairs should be grid or slab structure, with safety guardrails on all open surfaces.